Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Product Details
Products details
Input | AC 100-240V 50/60HZ |
Output | 5V4000MA/12V2000MA/24V1000MA |
DC Cable | 1m 1.2m 1.5m(optional) |
Size | 58*36.5*24mm |
Colour | black white |
Efficency Level | DoE V |
Warrenty | 3 years |
Certificated Approved | FCC CE SAA PSE KC RCM KCC |
Work Temperature | -10℃~40℃ |
Storage Temperture | -20℃~60℃ |
Work Humidity | 20%-90%RH |
Products Description
Best selling
Certifications
Company Profile
Production Flow
Attend the exhibition
Feedback
Package and Shipping
FAQ
Q : What's your MOQ?
A : MOQ is 1Box ,small trial order is also OK if we have stock material,
Q : What's your main markets? Can we trust you?
A : Pls check transaction history from our alibaba company profile.
Q : Which payment do you accept?
A : You could use PAYPAL ,ALIPAY, Bank transfer T/T etc. Or we accept alibaba
trade assurance with Master card/Visa/T/T/E-checking
Q : What is your samples lead time or goods delivery time?
A : Samples time about 5 working days ,goods time about 12 working days.
Q : Why is new model expensive than other old models?
A : A new model needs large R&D and mould cost, and the depletion rate is bigger during mould
and production. Besides, new model is low productive but labor costs keep same as old model.
Q : Could I visit your factory
A : We welcome you doing that!
A : MOQ is 1Box ,small trial order is also OK if we have stock material,
Q : What's your main markets? Can we trust you?
A : Pls check transaction history from our alibaba company profile.
Q : Which payment do you accept?
A : You could use PAYPAL ,ALIPAY, Bank transfer T/T etc. Or we accept alibaba
trade assurance with Master card/Visa/T/T/E-checking
Q : What is your samples lead time or goods delivery time?
A : Samples time about 5 working days ,goods time about 12 working days.
Q : Why is new model expensive than other old models?
A : A new model needs large R&D and mould cost, and the depletion rate is bigger during mould
and production. Besides, new model is low productive but labor costs keep same as old model.
Q : Could I visit your factory
A : We welcome you doing that!
Customer Reviews total 0 items