Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
China
Long Term
2019-11-19 18:56
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Quantity(Sets) | 1 - 500 | >500 |
Est. Time(days) | 30 | To be negotiated |
Title | Hanging solar lights outdoor round column home light home lighting outdoor QP03 |
Model No | JR-CGY/3 |
Housing Material | PC |
Body Color | BLUE/White/RED(Any color can make) |
Solar Panel | 12W/15W/20W |
Battery | 2600/4400/5200mah Lithium battery |
Controller | Switch |
Working Time | 6-8hours |
LED Source | 3*3W high brightness LED |
LED colors | white/warm white |
Average operation time | 6-8 hrs/day |
Average Life (hrs) | 35000-50000 |
Temperature Range | -20 -- +60 Degree |
Charging time | 4 hours |
Warranty | 2 Years |
1:Automatic Sensor Function.2:Super Bright LED.3:Free Green Energy.4:100% Waterproof.5:Easy Assemble and Install.
residential quarters, city parks, tourist attractions, plaza, outdoor terrace, garden villas, green square, resorts, golf courses, corporate factory green lighting and landscaping, residential housing,city roads.
Wisdom Solar have CE,EMC,LVD certifications.Applicable to the following models:JR-B007 Series, JR-2602 Series, JR-B008 Series, JR-CP02 Series, JR-3018 Series, JR-CP46, JR-CP83, JR-CP80, JR-CP95, JR-B002, JR-B009, JR-2713, JR-CP96, JR-CP10, JR-CP11, JR-B005, JB-006, JR-2012, JR-CP12, JR-3210, JR-3201, JR-PB001, JR-PB002, JR-PB006, JR-PB008.and It have the ISO9001certification.All our products are guaranteed for 3 years.
Payment Term | T/T | 30% T/T in advance, paid the balance before shipment oragainst copy of B/L | |||
L/C | L/C amount above 50,000 usd, we can accept L/C at sigh | ||||
West Union | Amount lower than 5000usd | ||||
paypal | 30% T/T in advance, paid the balance before shipment | ||||
Trade Assurance | We welcome use Trade Assurance, you'll enjoy: 100% product quality protection 100% on-time shipment protection 100% payment protection for your covered amount | ||||
Delivery Time | 15~30days after receiving payment for one container |
Packing | Foamed plastic inside to protect solar panel, pole, base from scar, 5mm solid paper box |
By sea | Delivery from Guangzhou,Shenzhen,Zhongshan seaport |
By air | Departure from Guangzhou Baiyun Airport |
By express | By TNT/DHL |
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items