GF2-250KVA silent three phase water cooled diesel generator
MODEL | GF2- 250KVA | Standby Power (50HZ ) | 220KW / 275KVA | Prime Power(50HZ ) | 200KW / 250KVA | ENGINE DATA | Engine Type | DCEC Cummins 6LTAA8.9-G2,4-cycle | Air Intake System | Turbo,Air/Air Cooling | Fuel System | P7100 fuel pump | Fuel Consumption (g/kw.h) | 197 | Cylinder Arrangement | 6 in line | Displacement | 8.9L | Bore×Stroke | 114×145(mm) | Compression Ratio | 16.0:1 | Rated RPM | 1500rpm | Max.Standby Power at Rated RPM | 240KW / 326HP | Governor Type | Electronic | Max Water Temperature | 104℃ | ALTERNATOR DATA | General Data | Compliance with GB755,BS5000,VDE0530,NEMAMG1-22,IED34-1,CSA22.2 and AS 1359 standards. | Alternator Data | Number of Phase | 3 | Connecting Type | 3 Phase and 4 Wires,"Y" type connecting | Number of Bearing | 1 | Power Factor | 0.8 Lag | Protection Grade | IP23 | Altitude | ≤1000m | Exciter Type | Brushless,self-exciting | Insulation Class,Temperature Rise | H/H | Telephone Influence Factor(TIF) | <50 | THF | <2% | Voltage Regulation,Steady State | ≤±1% | Alternator Capacity | 250KVA | Alternator Efficiencies | 92.70% | Air Cooling Flow | 0.58m3/s | Dimension & Weight | Open Type | Soundproof Type | Overall Size :2.6(m)×1(m)×1.67(m) | Overall Size :3.2(m)×1.2(m)×1.75(m) | Weight :2200kg | Weight:2900kg |
|
Contact us
How to come to Hi-earns?
♦ Line 1:TAXI
Shanghai International Airport(Pudong)
Cost(USD):85
Time:2.5 hours
♦Line 2:High speed rail
Shanghai Hongqiao railway station---Changzhou railway station
Cost(USD):20
Time:1 hour
Lisa Jia
Sales manager
♦ Mobile/WhatsApp/Wechat: +86-13328198882
♦ E-mail: hiearns5@ vip.163.com
♦ SKYPE: jia.lisa7
♦ TradeManager: cn220086459
♦ QQ: 1562536125
Customer Reviews total 0 items