3.0-3.2V 0.06W 3-7 Lm Low Power Consumption Super Light Red Blue Green Light Led Diode Smd 3528 Led Chip SMD LED 3528

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Lights & Lighting
  • Validity Period:

    Long Term

  • Published on:

    2020-12-17 14:54

Other Products
5VDC SMD Flex Digital Led Strips Light With With Intelligent Control WS 2812B 5050 RGB Led Strips Lights Led WS2812b
¥Negotiable 3Views

5VDC SMD Flex Digital Led St

Recommend  
High Quality Voice Download 16P-16m Rewritten Repeatedly Speech Module Speech Chip WT588D Module
¥Negotiable 5Views

High Quality Voice Download

Recommend  
ZIP25 TB2930HQ TB2930AHQ New Original Amplificador De Audio Para Carro Automotive Car Power Audio Amplifier Ic chips
¥Negotiable 8Views

ZIP25 TB2930HQ TB2930AHQ New

Recommend  
3W 3.0-3.4V 20-30 lm Blue Light High Power Brightness Temperature Resistance Led Lamp Beads Lumen 45MIL Chip Led Epistar Chip
¥Negotiable 6Views

3W 3.0-3.4V 20-30 lm Blue Li

Recommend  
1.8-3.2V 0.06W High Lighter Bead LED Lamp Bead 5050 White Light Led Diode Smd 3528 Led Chip SMD LED 3528
¥Negotiable 5Views

1.8-3.2V 0.06W High Lighter

Recommend  
You may like
  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

3.0-3.2V 0.06W 3-7 Lm Low Power Consumption Super Light Red Blue Green Light Led Diode Smd 3528 Led Chip SMD LED 3528
Integrity card
You may also like
Product Description
Power
0.06(W)
Forward Voltage
1.8-3.2(V)
Rated Current
20m(A)
The Brand OF Glue
Whalley
Irritation Angle
120(°)
Thermal Resistance
≤5(°/W)
Pass The LM-80 Test
No
Backward Voltage
5(V)
Chip Brand
Saman
Wire Material
Silver Thread
Luminous Efficiency
100(lm/W)
TJMAX
-30~+85(°)
Color Temperature Range
620-625(K)
Electrostatic Breakdown Voltage (ESD)
1000(V)
Steady OF Deskop
EMC
Color Tolerance
〈7(SDCM)
1000 Hours Conventional Aging
100(%)
Correlated Colour Temperature
3528 Red light 1.9T thick 2K,3528 yellow light 1.9t thick 2K,3528 Blue light 1.9t thick 2K,3528 green Light 1.9t thick 2K (K)
1、Features
Package ( L/W/H ) : 5.0*5.0*1.5mm
* Color : Ultra BrightStandard Yellow
* Lens: Yellow DiffuseFlat Mold
* EIA STD Package
* Meet ROHS, Green Product
* Compatible With SMT Automatic Equipment
Compatible With Infrared Reflow Solder And Wave Solder Process

2、 Package Profile & Soldering PAD Suggested
3. Absolute Maximum Ratings At Ta=25℃
Parameter
Symbol
Rating
Unit
Power Dissipation
Pd
Y1
90
mW
Y2
90
Y3
90
Peak Forward Current
(1/10 Duty Cycle, 0.1ms Pulse Width)
IFP
Y1
100
mA
Y2
100
Y3
100
DC Forward Current
IF
Y1
30
mA
Y2
30
Y3
30
Reverse Voltage
VR
Y1
5
V
Y2
5
Y3
5
Operating Temperature Range
Topr
-30°C ~ + 85°C
Storage Temperature Range
Tstg
-40°C ~ + 90°C
Soldering Condition
Tsol
Reflow soldering : 260°C For 5 Seconds
Hand soldering: 300°C For 3 Seconds
4、 Electrical Optical Characteristics At Ta=25℃
Parameter
Symbol
Color
Min.
Typ.
Max.
Unit
Test Condition
Luminous Intensity
IV
---
---
---
Mcd
IF = 60mA
Y
600
----
800
---
---
---
CIE 1931 Coordinate
Nm
Y
---
588
---
nm
IF=20mA/dice
Y
---
590
---
Y
---
592
---
Forward Voltage
VF
Y
---
2.0
---
V
IF=20mA /dice
Y
---
2.2
---
Y
---
2.4
---
Reverse Current
IR
Y
---
---
10
uA
VR=5V
Y
---
---
10
Y
---
---
10
Viewing Angle
2θ1/2
---
---
120
---
deg
IF = 20mA/dice
Notes: 1. Luminous intensity is measured with a
light sensor and filter combination that approximates the
CIE eye-response curve.
2. θ1/2 is the off-axis angle at which the luminous intensity is half the axial luminous intensity.
3. The dominant wavelength, λd is derived from the CIE chromaticity diagram and represents the
single wavelength which defines the color of the device.
5、Label explanation
CAT:Luminous Intensity Rank(unit : mcd)
HUE:CIE 1931 Coordinate Rank
REF:Forward Voltage Rank(unit : V)
Rank Tolerance:
a. Luminous Intensity: ± 15%
b. HUE: ± 0.01
c. Forward Voltage: ± 0.1V
Classification
Test Item
Test Condition
Reference Standard
Reference Standard
Endurance
Test
Operation Life
Ta= Under Room Temperature As Per Data Sheet Maximum Rating
1000HRS (-24HRS,+72HRS)*@20mA
MIL-STD-750D:1026
MIL-STD-883D:1005
JIS C 7021:B-1
High Temperature, High Humidity Storage
IR-Reflow In-Board, 2 Times
Ta= 65±5℃,RH= 90~95%
240HRS±2HRS
MIL-STD-202F:103B
JIS C 7021:B-11
High Temperature
Storage
Ta= 105±5℃
1000HRS (-24HRS,+72HRS)
MIL-STD-883D:1008
JIS C 7021:B-10
Low Temperature
Storage
Ta= -55±5℃
1000HRS (-24HRS,+72H RS)
JIS C 7021:B-12
Environmental
Test
Temperature
Cycling
105℃ ~ 25℃ ~ -55℃ ~ 25℃
30mins 5mins 30mins 5mins
10 Cycles
MIL-STD-202F:107D
MIL-STD-750D:1051
MIL-STD-883D:1010
JIS C 7021:A-4
Thermal
Shock
IR-Reflow In-Board, 2 Times
85 ± 5℃ ~ -40℃ ± 5℃
10mins 10mins
10 Cycles
MIL-STD-202F:107D
MIL-STD-750D:1051
MIL-STD-883D:1011
Solder
Resistance
T.sol= 260 ± 5℃
10 ± 1secs
MIL-STD-202F:210A
MIL-STD-750D:2031
JIS C 7021:A-1
IR-Reflow
Normal Process
Ramp-up rate(183℃ to Peak) +3℃/ second max
Temp. maintain at 125(±25)℃ 120 seconds max
Temp. maintain above 183℃ 60-150 seconds
Peak temperature range 235℃+5/-0℃
Time within 5°C of actual Peak Temperature (tp)
10-30 seconds
Ramp-down rate +6℃/second max



--------
MIL-STD-750D:2031.2
J-STD-020C
IR-Reflow
Pb Free Process
Ramp-up rate(217℃ to Peak) +3℃/ second max
Temp. maintain at 175(±25)℃ 180 seconds max
Temp. maintain above 217℃ 60-150 seconds
Peak temperature range 260℃+0/-5℃
Time within 5°C of actual Peak Temperature (tp)
20-40 seconds
Ramp-down rate +6℃/second max



--------
MIL-STD-750D:2031.2
J-STD-020C
Solderability
T.sol= 235 ± 5℃
Immersion rate 25±2.5 mm/sec
Coverage ≧95% of the dipped surface
Immersion time
2±0.5 sec
MIL-STD-202F:208D
MIL-STD-750D:2026
MIL-STD-883D:2003
IEC 68 Part 2-20
JIS C 7021:A-2
7、Cautions
Application
1. A LED is a current-operated device. The slight shift of voltage will cause big change of current, which will damage LEDs.
Customer should use resistors in series for the Over-Current-Proof.
2. In order to ensure intensity uniformity on multiple LEDs connected in parallel in an application, it is recommended to use
individual resistor separately, as shown in Circuit A below. The brightness of each LED shown in Circuit B might appear difference
due to the differences in the I-V characteristics of those LEDs.
3. High temperature may reduce LEDs’ intensity and other performances, so keeping it away from heat source to get good performance
is necessary.
Storage
1.Before opening original package, it is recommended to store them in the following environment:
Temperature: 5℃~30℃ Humidity: 85%RH max.
2. After opening original package, the storage ambient for the LEDs should be in 5~30°C temperature and 60% or less relative
humidity.
3. In order to avoid moisture absorption, it is recommended that the LEDs that out of the original package should be stored in a
sealed container with appropriate desiccant, or in desiccators with nitrogen ambient.
4. The LEDs should be used within 168hrs (7 days) after opening the package. Once been mounted, soldering should be quick.
5. If the moisture absorbent material (silica gel) has faded away or the LEDs stored out of original package for more than 168hrs
(7 days), baking treatment should be performed using the conditions: 60℃ at least 24 hours.
ESD (Electrostatic Discharge )-Protection
A LED (especially the Blue、White and Green product) is an ESD sensitive component, and static electricity or power surge will
damage the LED. ESD-damaged LEDs will exhibit abnormal characteristics such as high reverse leakage current, low forward voltage,
or “no light-up” at low currents, etc.
Some advice as below should be noticed:
1. A conductive wrist strap or anti-electrostatic glove should be worn when handling these LEDs.
2. All devices, equipment, machinery, work tables and storage racks, etc. must be properly grounded.
3. Use anti-static package or boxes to carry and storage LEDs. And ordinary plastic package or boxes is forbidden to use.
4. Use ionizer to neutralize the static charge during handling or operating.
5. All surfaces and objects within 1 ft close to LEDs measure less than 100V.
Cleaning
Use alcohol-based cleaning solvents such as IPA (isopropyl alcohol) to clean LEDs if necessary.

Soldering
1. Soldering condition refer to the draft “Soldering Profile Suggested” on page 1.
2. Reflow soldering should not be done more than 2 times.
3. Manual soldering is only suggested on repair and rework. The maximum soldering temperature should not exceed 300°C within 3
Company Introduction
Shenzhen Tianqi Sheng Electronic Co., Ltd. Established in 2000 as independent distributor of electronic components, specializes in offering all kinds of world famous brands on Active and Passive components, besides, we are also strong on the Capacitors like multilayer chip ceramic capacitor, aluminum capacitor, tantalum capacitor and electrolytic capacitor, the components are widely used in electrical home appliances, communications, industry, and military etc. We can provide one stop BOM service.
Credit Report

Our Services & Strength

We can provide one stop BOM service, also can help you find halt production part no.
Packing&Shipping
Our logistics.
We will ship all your order within 3 working days after receiving your payment. Otherwise, we will state in the invoice in advance.DXL/FedEX/TNT/UPS/EMS/China Post/Hong-kong Post are available.Please make sure your delivery address and contact telephone number are correct when you bid the item.
FAQ
Q: Are your products original?
A: Yes! All products are original and produced by original manufacturers. Our parts could accept any kinds of testing, if there is quality problems we will take responsible.

Q: What is your warranty?
A: Within 90 days after package have been received.

Q: What is your lead time?
A: There are on lead time for in-stock products. Most of the parts could be shipped out within 3 days after payment have been confirmed.

Q: What’s the MOQ for your products?
A: We accept small orders from our customers. Please feel free to contact us.

Q: May I have a sample for testing?
A: Yes! Only to pay shipping cost, free samples could be sent for testing.

Q: How do I pay for the order?
A: You may pay by TT, Paypal, Western Union and Ali-baba online.Or you may also consult us.

Q: How are my parcel is shipped?
A: Normally we use DHL, FedEx, TNT, EMS etc. Please contact with us otherwise.

Q: Do you provide the BOM Kitting service? Can I send my BOM to you?
A: Yes, certainly. Please feel free to contact us and send us the BOM, we will quote to you.
Why Choose Us
Related Products
Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links