500C 30T Hydraulic Laminating Hot Press with Dual Heating Platen

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Batteries
  • Validity Period:

    Long Term

  • Published on:

    2021-12-28 12:01

  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Product Description

500C 30T Hydraulic Laminating Hot Press with Dual Heating Platen 

Features

YLJ-HP300 is CE certified and UL-ready 500°C Max. lamination hot press, which consists of a 30T hydraulic press with two heated  platens. The temperatures of the heated platens are controlled by two digital temperature controllers separately up to 500°C.  The platen ( 300 x 300 mm area)  are made of harden Cr12MoV alloy with a flat surface. Water cooling jackets are installed with the heating platen that allows heated plate get faster cooling.

One pressure gauge ( 300 kN) is also mounted to monitor the pressure applied on the platen. It is an excellent tool to prepare polymer and ceramic samples.

 

Technical Parameter 

Hydraulic Press

1. Hydraulic pump and hydrailic cyliner are separated  for easy replacement

2. Max. Force:  30 T  

3. Manual operation

Max. Working Pressure

Gauge Displayed Pressure Value (MPa)

5     

10 

15   

20    

25    

30    

35    

40    

 50

Actual Force Applied on the Hydraulic Cylinder (Ton)

3   

6     

9   

12   

15

18

21

24

30

1.Displayed Pressure Value to Actual Applied Force Conversion: 1 MPa = 0.6 Ton

2.The actual force applied on the Hydraulic Cylinder (Ton) equal to the force applied on your working piece

3.For calculating the actual pressure (MPa) applied on your working piece, please follow the equations in below:

          P = T/(πr^2) x g x 10

P: Pressure (MPa) applied on your working piece

T: Force (Ton) applied on the Hydraulic Cylinder 

g: Standard gravity. g ≈ 9.8 m/s2

π: ~3.14

r: Radius (cm) of the working piece

*1 Metric Ton = 1000 kg; 1 MPa ≈ 10 kgf/cm2 

Pressure Gauge

· Measuring Accuracy is  +/-1.25 kN

Heated Platen Area

1. Platen Area:   300 mm x 300 mm  ( Nominal 12"x12" )

2. Material:         Headen Cr12MoV alloy

3. Surface:         Flattening with CNC grinding 

Max. Travel Distance 

1. 80 mm 

2. Do not raise the bottom cylinder (piston) more than it's maximum traveling distance. (80 mm)

Max. Working Temperature

1. 450°C continuous with water cooling

2. 500°C for less 30 minutes

Heating Rate

· ≤ 2°C/min

Water Cooling Jacket

1. Two water cooling jacket are built on the back of top and bottom heating plate separately with 1/4" water pipe connectors. Such a configuration allows you cool the sample as soon as the hot pressing process is completed. 

2. Please consider using one recirculating water chiller to save water and protect the environment (order separately by click picture below)

Temperature Control

1. Two digital controllers are installed in one box with 30 segments programmable and auto-tune faction

2. Temperature accuracy ±2°C.

Power Requirement

1. 208 - 240 VAC, 50/60Hz, single phase

2. 3.5 kW max.

3. 20 A circuit breaker is required for 220 V,  5' length power cable included, but no plug

Compliance

· CE Certified 

    Shipping Weight

150 lbs

      Warranty

· One year limited standard warranty (Extended warranty is available up to 5 years at extra cost)

Application Note

· The Hot Press Can be located inside of a glove box which temperature controller and pump will be put outside of glove box

 

Product Images

 

 

 

 

Our Company & Team

Certifications

CERTIFICATE

Strength Proof

All our products are passed the inspection standards included SGS, CE, ASTM with 100% quality.

Cooperative Partner

Packaging & Shipping

PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to production season and order quantity.

FAQ
About Product

 1. Which procedure to secure your Quality?

Our company has own research & development and production base, the products have been calibrated by central laboratory professionals before they leave the factory, ensure the accuracy of test results and authority.
2.How about your company product after-sales service system?
Product after-sale guarantee period is 12 months, and we can provide a lifetime repair guarantee. We have agents in some countries, they can provide door-to-door service. If there is no agent, our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.
3.Products standards?
Our instruments adopt ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.
4. Our country's power supply and plug are different, how do you solve it?
We can according to different countries and the power plug, equipped with a transformer and plug that in accordance with your local requirement.
5.Payment methods?
T/T, L/C, D/P and so on
6.Packing method?
Standard export wooden box packaging
7.How about customers evaluation for your products?
Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek, our high-quality products and first-class after-sales service. Our services get the trust of the customer satisfaction and recognition for themselves.
8.Main export market?
Now our products have been exported to North America, Europe, Southeast Asia, South America and other countries.
10. How to ensure the customer standard use the instrument?
We can provide each product-related video showing how to install and operate. If you have specific needs, we also can arrange the engineer to the customer's company for equipment operation training.
 
About Shipping

 1.Order processing?

Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damaged part for you for free.
3.Order tracking?
An online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.
If you need a tracking number for your order, please send an email to us with your order/invoice number.
4. Import/export tax, duty, GSM, Customs Clearance, and etc?
All import/export related expenses are the sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.
5.Lost or Stolen packages?
Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.

 

 

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links