Bubble wrap with plastic film or wooden with iron sheet
Port
Shanghai port
Picture Example:
Lead Time:
Quantity(Pieces)
1 - 1
2 - 4
>4
Est. Time(days)
25
35
To be negotiated
Video Description
Related Products
GF2-40KW/50KVA silent three phase water cooled diesel generator
Voltage
Frequency (HZ)
Phase
Power
factor
Standby Amps
Standby Ratings
(KW/KVA)
Prime Ratings
(KW/KVA)
254/440
50
3
0.8
74
45/56
40/50
240/415
50
3
0.8
78
45/56
40/50
230/400
50
3
0.8
81
45/56
40/50
220/380
50
3
0.8
85
45/56
40/50
Standby Power Rating(ESP):The standby power rating is applicable for supplying emergency power for the duration of a utility power interruption.No overload,utility parallel or negotiated outage operation capability is available at this rating.
Prime Power(PRP):Prime power is available for an unlimited number of annual hours in variable load application,in accordance with GB/T2820-97 (eqv ISO8528);A 10% overload capability is available for a period of 1 hour within a 12-hour period of operation.
ENGINE DATA
Engine Type
Yuchai Engine YC4FA75L-D20
Rated RPM (r/min)
1500rpm
Cooling System
Forced Water-cooled
Cylinder Number
4
Bore×Stroke (mm)
96×103
Start Method
Electric Start
Combustion Chamber Type
Direct Injection
ALTERNATOR DATA
Power Factor
0.8
Insulation Class
H
Lubricating System
Pressure,Split,Complex
Protection Grade
IP23
Exciter Type
Brushless,self-exciting
Altitude
≤1000m
Environment Temperature
40
Connecting Type
3 Phase and 4 Wires,"Y" type connecting
Intake Type
Natually-Aspirated
Rated Speed Regulation
≤±1%
Phase
3
Dimension & Weight
Open Type
Soundproof Type
Overall Size:1.80(m)×0.75(m)×1.45(m)
Overall Size:2.40(m)×1.00(m)×1.45(m)
Weight:930kg
Weight:1450kg
Contact us
How to come to Hi-earns?
♦ Line 1:TAXI
Shanghai International Airport(Pudong)
Cost(USD):85
Time:2.5 hours
♦Line 2:High speed rail
Shanghai Hongqiao railway station---Changzhou railway station
Customer Reviews total 0 items