Packaging details:Wooden with plastic film
Delivery time: 20 days
Port
FOBshanghai
Picture Example:
Lead Time:
Quantity(Pieces)
1 - 1
2 - 4
>4
Est. Time(days)
25
35
To be negotiated
Video Description
GF2-65KVA silent three phase water cooled diesel generator
Voltage
Frequency (HZ)
Phase
P.F(COS)
Standby Amps
Standby Ratings
(KW/KVA)
Prime Ratings (KW/KVA)
440/254
50
3
0.8
89
54/68
50/63
415/240
50
3
0.8
94
54/68
50/63
400/230
50
3
0.8
97
54/68
50/63
380/220
50
3
0.8
103
54/68
50/63
Standby Power Rating(ESP):The standby power rating is applicable for supplying emergency power for the duration of a utility power interruption.No overload,utility parallel or negotiated outage operation capability is available at this rating.
Prime Power(PRP):Prime power is available for an unlimited number of annual hours in variable load application,in accordance with GB/T2820-97 (eqv ISO8528);A 10% overload capability is available for a period of 1 hour within a 12-hour period of operation.
ENGINE DATA
Engine Type
Yuchai Engine YC4D90Z-D20
Shape
Straight 4 cylinder
Bore×Stroke (mm)
108×115
Power/Speed (KW/r/min)
60 / 1500
Intake Type
Pressurize
Adjust Speed Type
Electronic Speed Controller
Engine output end specification--Flywheel case
SAE3#
Engine output end specification--Flywheel
SAE11.5
Dimension (mm)
1100×750×960
Weight (kgs)
370
ALTERNATOR DATA
Alternator Data
Power Factor
0.8 Lag
Insulation Class
H
Lubricating System
Pressure,Split,Complex
exhaust Air Temperature (℃)
≤600
Altitude
≤1000m
Environment Temperature (℃)
40
Connecting Type
3 Phase and 4 Wires,"Y" type connecting
Ignite sequence
1-3-4-2
Rated Speed Regulation %
≤±1%
Phase
3
Dimension & Weight
Open Type
Soundproof Type
Overall Size :2(m)×0.82(m)×1.16(m)
Overall Size :2.21(m)×1(m)×1.43(m)
Weight :980kg
Weight :1150kg
Contact us
How to come to Hi-earns?
♦ Line 1:TAXI
Shanghai International Airport(Pudong)
Cost(USD):85
Time:2.5 hours
♦Line 2:High speed rail
Shanghai Hongqiao railway station---Changzhou railway station
Customer Reviews total 0 items