Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Product Details
Specifications
Double pointed lamp, /3 lamp / car double peak decode lamp, /canbus anti alarm reading lamp / plate number lamp
LED quantity: 4
Length: 36mm/39MM/41MM
Voltage: 12V, can be customized 24V
Function: with decoding CANbus, with aluminum cooling
Light source: LED belongs to semiconductor solid state light source, anti vibration, waterproof and light efficiency. It belongs to green light source. The European auto industry already has mandatory standards to use the LED as an automotive light source.
Energy saving: it is 1/10 of energy consumption of traditional halogen lamp, and can protect automobile circuit better.
Long life: up to 50 thousand hours, the traditional light bulb does not exceed 2 thousand hours.
Quick start: LED does not require hot start time, fast response (nanosecond), and is suitable for moving fast objects.
Installation notes: no need to refit the circuit, replace the traditional glass bulb directly, pay attention to the original lamp is very hot, please replace when careful!
Shaoxing big house Co., Ltd. is located in Asia's largest auto parts. We are a professional manufacturer of auto parts,
set design, development, manufacturing as a professional manufacturer.We focus on a series of fashion accessories,
a wide range of diversity, reasonable price and on-time delivery.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Customer Reviews total 0 items