Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
China
Long Term
2019-10-16 18:16
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Aluminu Shell CET-117/A 300W Led High Bay Light For Street Lighting With CE CB ISO Personal Box
Product Features: *Wattage: 300w *Chip: Epistar *Voltage: AC 85-265V 50/60HZ *Lumen: 27000lm *Installtion: |
*Material: Aluminum *Color Temperature: 2700-6500k *Power Factor: >0.90 *CRI: 80 *Warranty: three years *Product Size: 500*585mm * Body Color: |
Packaging Details: CARTON Carton Dimensions: 26*26*38.5cm Quantity/Carton: 1pcs Quantity of 20GP/40GP/40HQ: 1076/2230/2615pcs | |
Certificates: IS09001:2000/CE/EMC/RoHS/LVD/ERP | Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea. over 10 years’ experience for logistical arrange |
Delivery Time: Material Preparation Time 10 days Assembly & Packaging Time: 15 days Total Delivery Time 25 days in 50,000PCS for safe delivery lead time The faster delivery could be negotiable | Factory Scale: Total Area of 5000 square meters (538193 Production Staff 100 to 200 QC Staff: 10 to 20 R&D Staff: 6 to 10 |
Application Factory, Building, Stadium, Flyover, Monument, Park
COMPARE SIMILAR PRODUCTS
|
Can I have a sample for testing?
Yes, we can offer free sample, but you should afford the shipping cost.
Can I add my logo on the products?
Yes, OEM and ODM are available for us.
How can I get the after-service?
We will send you the free spare parts if the problems caused by us. If the products can not be
repaired, we will send you new free quantity together with next order.
Do you have inspection procedures for products?
our products100% self-inspection and testing before packing.
Can I have a visit to your factory before the order?
Sure,welcome to visit our factory.
Here is our factory address: #7 Tongyi Industrial Area, Zhongshan City, Guzhen Our factory is
near Guangzhou airport, and we can pick you up in the airport, Hotel booking service is available.
How about delivery time of the order?
15-20 days after getting deposit.
How about payment terms?
20%-30% deposit, the rest payment balance against B/L. If have regular order and good order
quantity, we can give delay payment.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items