Automatic Double Side Numerical Control EV Battery Spot welder Welding Machine For 18650 Cylindrical Battery Pack

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Batteries
  • Validity Period:

    Long Term

  • Published on:

    2021-12-28 11:49

Other Products
Lithium Battery Raw Material LiFePO4 Powder Used For Li-Ion Battery Cathode Materials
¥Negotiable 99Views

Lithium Battery Raw Material

Recommend  
Turntable  Sealing Machine with Double Station Automatic mode for Pouch Battery Cell
¥Negotiable 69Views

Turntable Sealing Machine w

Recommend  
99.99% High Purity Lithium Chip/Disc for Coin Cell Assembly
¥Negotiable 57Views

99.99% High Purity Lithium C

Recommend  
Roller Calender Pressing Machine for Lab Lithium ion Battery Research
¥Negotiable 53Views

Roller Calender Pressing Mac

Recommend  
Laboratory Hydraulic Press Accessories Powder Pellet Square Press Die
¥Negotiable 61Views

Laboratory Hydraulic Press A

Recommend  
You may like
  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Product Description

Automatic Double Side Numerical Control EV Battery Spot welder Welding Machine For 18650 Cylindrical Battery Pack

 

This machine is used for 18650,26650,32650 cylinder battery pack automatic spot welding, it can weld both side together with high speed and good effect.

 

Features

1.Support break point start, support automatic start and manual start mode conversion.

2.It has a false spot welding and out of spot welding alarm function.

3.Programming is simple, and it supports any point programming and array programming. 999 groups can be saved programming files.

4.Welding needle replacement forecast reminder.

5.Own welding current monitoring system, real-time monitoring of welding current.

Specifications

Model

Automatic Battery Pack Welding Machine TMAX-DH-20000

Y-axis travel

450mm

Z-axis travel

250mm

Spot welding speed

0.5s / point; 3200pcs / h

Maximum speed of motor drive

300mm/s

The maximum number of batteries loaded

200pcs (standard 18650 lithium battery)

Number of groups for storing files

99 groups

Operating system

Embedded system + man-machine screen

Transmission

Stepper + imported precision linear guide (optional servo + screw)

Power supply

Single-phase  220V ± 10% / 50Hz ± 10%

Air supply

0.3 ~ 0.4Mpa

Weight

400KG

Dimensions

900mm*1300mm*1800mm

Welding achine parammeter

Power supply : AC220V±10% 50Hz  

Max output current : 8000A

Max power : 35kva

Welding current checking

Dimension : 185(W)*270(H)*425(D)mm

 

Product Images

Our Company & Team

Certifications

CERTIFICATE

Strength Proof

All our products are passed the inspection standards included SGS, CE, ASTM with 100% quality.

Cooperative Partner

Packaging & Shipping

PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

FAQ
About Product

 1.Which procedure to secure your Quality?

Our company has own research & development and production base, the products have been calibrate by central laboratory professionals before before they leaves the factory, ensure the accuracy of test results and authority.
2.How about your company product after-sales service system?
Product after-sale guarantee period is 12 months,and we can provide lifetime repair guarantee.We have agents in some countries,they can provide door-to-door service.If there is no agent,our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.
3.Products standards?
Our instruments adopts ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.
4.Our country's power supply and plug are different, how do you solve it?
We can according to different countries and the power plug, equipped with transformer and plug that in accordance with your local requirement.
5.Payment methods?
T/T, L/C, D/P and so on
6.Packing method?
Standard export wooden box packaging
7.How about customers evaluation for your products?
Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek,our high quality products and first-class after-sales service.Our services get the trust of the customer satisfaction and recognition for themselves.
8.Main export market?
Now our products have been exported to North America, Europe, southeast Asia, South America and other countries.
10.How to ensure the customer standard use the instrument?
We can provide each product related video showing how to install and operate.If you have specific needs, we also can arrange engineer to the customer's company for equipment operation training.
 
About Shipping

 1.Order processing?

Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damage part for you for free.
3.Order tracking?
Online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.
If you need a tracking number for your order, please send an email to us with your order/invoice number.
4. Import/export tax, duty, GSM, Customs Clearance, and etc?
All import/export related expenses are sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.
5.Lost or Stolen packages?
Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.

 

 

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links