Our factory with 260,000 sqm standard modern workshop, more than 3,000 employees, 70 professional develop engineers.With 50 automated assembly lines and 40 Panasonic SMT lines. Sino-foreign joint ventures, professional management, fast delivery time,ect
Fixed Luminaire For LED Modules(Celling Suspend Mounted, Non-Controlled Port Dimming,A.C. Supplied Electronic Controlgear For LED Modules,Class ii,IP20,Suitable For Direct Mounting On Normally Flammable Material,ta:45centigrade)
2019-11-17 ~ 2024-11-18
CE
BCTC
G bulbs
2019-09-18 ~
-
Verified
-
Certification
Picture
Certification Name
Issued By
Business Scope
Available Date
Verified
ISO14001
Other
Production and Service of Energy -Saving Lamp Tube; Design, Development, Production and Service Lamps, Integrated LED Lamps For General Lighting and LED Lamp Products, and Related management activity
2019-08-01 ~ 2022-07-31
Other
Other
Production and Service of Energy -Saving Lamp Tube; Design, Development, Production and Service Lamps, Integrated LED Lamps For General Lighting and LED Lamp Products, and Related management activity
2019-08-01 ~ 2022-07-31
ISO9001
Other
Production and Service of Energy -Saving Lamp Tube; Design, Development, Production and Service Lamps, Integrated LED Lamps For General Lighting and LED Lamp Products
Our bright set of gift boxes with 35 clear lights makes a cheerful holiday statement in the yard, under the tree or anywhere inside your house. These festive presents with an illuminated presence are a great way to decorate for Christmas.
Main Products
Why Choose Us
1.High quality products with competitive pricing.
2.Comprehenisve production capacity & on time shipping.
3.Creative new product and catagory designs.
4.Proactive corporate culture and efficient teamwork, professional service.
5.14 years production experience.
Recommended Products
Company Profile
Product Catalogue
Production Certification
Production Process
1.Bulb inspecton
2.Assemblying Light string
3. Cutting and Welding metal frame
4.Painting Metal frame
5.Wrapping thread on metal frame
6.Checking lights and assemblying light string on metam frame
7. Packing
8. Inspection
9. Shipping
FAQ
1. Are you a factory or trading company? A: We are the first hand manufacture factory. We also have our own trading and shipping department.
2. Are you ODM or OEM factory? A: We are both ODM & OEM factory.
3. Can I have a sample order? A: Yes, we welcome sample order to test and check quality.
4. What about the lead time? A:Sample needs 3-7 days. Order quantity less than 300pcs, mass production time needs 15-20 days;the quantity is less than 5000,and the delivery time is 45 days;more than 10000pcs, the lead time need to negotiate.
5. What is your MOQ? A: Usually our MOQ is 300pcs, 1pc for sample checking is available
6. How do you ship the goods and how long does it take to arrive? A: We usually ship by DHL, UPS, FedEx or TNT, V.Logistic. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
7. Can you design new product or package for us ? A: Yes. We have a professional team with rich experience in both production design and packaging design.
8: What are your terms of payments? A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.
Customer Reviews total 0 items