Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Product Details
DLC FA8 8Ft T8 LED tube directly replacement t12 tube
Product Description
Product name | LED T8 Tube- External Driver | ||
Featured Name | USA AL+PC TUBE (Type C) | ||
Main Materials | AL+PC | ||
Item No. | ARKWA/18K1202D | Life Span | 50000H |
Power | 2x18w | Warranty | 5 Years |
Size | 4ft, 1200mm | Certification | DLC |
Led Qty | 96leds | ||
Lamp luminous | 4000lm±10% | Usage | Houshold Lighting |
Working type | Type C | Application | Indoor |
Input voltage | AC100-277V | Installation/Connection | Single/Dual end input |
CRI/PF | >80/0.95 | Fluorescent Replacement | 48W in fluorescent |
CCT |
Warm White/Pure White/ Daylight White |
||
Pin base | G13 | Packing Size | 125x20.5x20.5cm |
IP Rating | IP40 | Packing Qty | 30pcs/ctn |
Beam Angle | 160 Degree | N.W | 10kg |
Led Source | SMD2835 | G.W | 11.5kg |
Cover |
Frosted Clear |
Capacity(Month) | 500,000pcs |
Port | Shenzhen | ||
Flicker free | NA | Pallet packing | YES |
Dimmable | NA | Corner protection | YES |
Other functions | NA | 20’GP/40’GP/40’HQ | 9000/20250/22500PCS |
THD | NA | Payment Terms | TT, LC |
Working temperature | -20~40℃ | Delivery Terms | EXW, FOB Shenzhen |
Storage Temperature | -30~50℃ | Lead Time |
3-5 working day for sampling 15-30 days for bulk order |
Drive Current | NA | MOQ | NA |
Surge Protection | NA |
Product Features
External Driver with DLC listed
-External driver, DLC listed, more Safety and Energy-saving ensured
- Dimmable available, able to line Tube lighting into your smart control system
-High lumens upto 140lm/w; Power Efficiency>96%
-light transimittance upto 95%
Saving Labor Cost
-5 years warranty, low maintenance cost
-Perfect compatibility with instant start electronic ballast
-G13 base, quick & easy installation
Packing Details
Applications
School/universities/hospital; Conference/meeting room, show room
Factories/offices; Supermarkets; Residential/institution buildings
Related Product
Europe Market LED Tube | T5/T6 LED Tube |
LED Troffer | LED Magnetic Strip Retrofit Kit |
Company Profile
>>>>>>Wanna Samples for quality test? Contact us!>>>>>>
FAQ
Q1. About trade terms
A: EXW Shenzhen in advance, FOB, CIF available for negotiation.
Q2. About payment terms
A: TT in advance, LC, OA available for negotiation.
Q3. About lead time
A: Usually, it takes about 3-7 days for sampling, 15-30 days for bulk order after payment( depends on order quantity)
Q5: About defective products and after-sales for defective products
A: Our strict quality control guarantee our non-defective rate on 97%-98%, for defective products, we ensure new and in good performance products can be offered for replacement during products warranty.
Customer Reviews total 0 items