North America 50.00%
Western Europe 20.00%
Eastern Europe 10.00%
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Features
Hot rolling machine for lithium polymer battery is mainly applied to laboratory battery materials, a small amount of gold and silver and other precious metals, copper and other nonferrous materials at a certain temperature, electric hot rolling, rolling thickness adjustable, easy to operate. Particularly suitable for clean energy materials lithium plate thinning and increased density.
Advantage:Increase the density of rolling material and decrease the thickness.
The roller size can be customized according to customer's request.
(100*100)mm
(100*200)mm
(100*400)mm
(150*400)mm
(150*200)mm
(150*300)mm
(200*200)mm
(200*300)mm
(200*400)mm
Specifications
Model | JS100 | JS150 | JS200 | JS250 | JS300 |
Roller Size | 96mm(Dia.) x 100mm(W) | 96mm(Dia.) x 150mm(W) | 96mm(Dia.) x 200mm(W) | 96mm(Dia.) x 250mm(W) | 96mm(Dia.) x 300mm(W) |
Effective Cylinder Width | 96mm | ||||
Product Thickness | 0~1.8 mm adjustable | ||||
Dial Gauge Accuracy | 0.01mm | ||||
Minimum Thickness | Depending on the electrode's material and thickness, typically: A 0.16mm thick electrode coated on copper can be pressed into a minimum thickness of 0.1 mm A 0.06mm thick electrode coated on copper can be pressed into a minimum thickness of 0.04 mm A 0.33mm thick silver/gold can be pressed into a minimum thickness of 0.03 mm | ||||
Heating Temperature | 130°C maximum Recommended Heating Rate: 1.3°C/minute Power of Heating Element: 800W Temperature Control : Precision temperature controller with +/-1°C Accuracy | ||||
Working Voltage | 110V - 240V AC, 50/60Hz, automatic switch for worldwide use | ||||
Roller | 1. Roller diameter tolerance: 0.004mm | ||||
Roller Surface Hardness | 62 HRC Never roll materials with hardness > 50HRC |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.
1.Which procedure to secure your Quality?
1.Order processing?
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items