Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Product Details
Factory High power exterior IP65 security led flood lighting fixtures
XF Series Sport Venue flood light is designed to replace tranditional Metal Halide Lamp .
Wattage Options :100W /120W/170W/220W
Beam Angle :Asymmetrical 60°*90 °
Symmetrical 90°*90°
Light Efficiency :140lm/W
Product Parameters
Item No. | Power (Watt) | Input Voltage(V) | Color Temperature (K) | CRI(Ra) | Light Efficiency(lm/W) | Beam Angle (°) | Protection Grade | Dimension (mm) | Warranty (Year) |
VL-FL-XF-100W | 100 | 90-305 | 3000-6500 | 70 | 140 | 60*90/90*90 | IP65 | 297*430*95 | 5 |
VL-FL-XF-120W | 120 | 90-305 | 3000-6500 | 70 | 140 | 60*90/90*90 | IP65 | 297*430*95 | 5 |
VL-FL-XF-170W | 170 | 90-305 | 3000-6500 | 70 | 140 | 60*90 | IP65 | 445*375*120 | 5 |
VL-FL-XF-220W | 220 | 90-305 | 3000-6500 | 70 | 140 | 60*90 | IP65 | 445*375*120 | 5 |
Q: Are you trading company or manufacturer ?
A: We are factory located in Shenzhen city which nearby to HongKong .
Q: How long is your delivery time?
A: Generally it is 3-5 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Sample is available , but not FREE . Every product have its own value , especially SAMPLE . But we can return the sample fee when you place volume orders .
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Q: How is your customer satisfaction ? What's your complaints handling ?
A: Customer satisfaction is 85%, our target in 2018 is 90%. Every Complaint must handle within 24 Hrs .
As A Tailored Outdoor Lighting Solution Provider we do
- Promptly Feedback : All inquiries will reply you in detail within 12 hours
- Professional lighting support: Professional proposal help you win project and saving more time and cost
- Strong Supply Chain : Matching Material ==>>Competetive Products From LED Source ,Power Supply , to Lighting housing , Lens ,Cable , we have mature supply chain to control risk .
Quality Control
- Stability TEST: make sure 100% of the lamps aging test at least 48 hours.
- Lighting TEST: make sure 100% of the lamps could be lighted before packing.
- Drop TEST: make sure every single light have been well protected by box.
Trade Terms
- Flexible Payment term:L/C, D/A, D/P, T/T, Western Union, PayPal.
- Lead time: normally in 10~15 days after deposit received
- Sample policy: Samples are always available for each model
Customer Reviews total 0 items