Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
China
Long Term
2019-10-16 21:08
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Quantity(Pieces) | 1 - 1 | >1 |
Est. Time(days) | 10 | To be negotiated |
HFC227ea fire suppression and protection system
we design, manufacture , equipment, installation, testing and maintenance of the clean agent System hfc-227ea .
Where to use :
Bank data room , gold house ,
painting lines
Generator room , motor room ,
switch board room
Transformer room
Computor and servor room
communication room
Ware house
all the other place where can"t put out the fire by water
We need following information of for make design
we need your detailed information support to calculate the qty of Cylinder , weight of gas ,pipe size, nozzle ...
1,What’s your protected subject :
Telecommunication Facilities________
Computer operations _______
Control rooms __________
Shipboard (marine )system ________
Rare book Libraries ____________
University and Museum _____________
Art Galleries _________________
Petrochemical installations _________
Medical Facilities and Pharmaceutical________
2,do you have room "s layout or drawing
yes ( if yes please send us your attachment )
2. no (if no please tell us below protection status)
A room size : length(X width(m)X height ( m) (M)
B raise floor(can"t greater than 30mm): _______(M ), or NO _____
C ceiling , height ____ (M) , or .no need consider
3 do you need a pressure release device ,yes .
4 storage cylinder must be placed in a separate room and towards the door opening direction
5 HFC-227ea system select
A , Dependable system one system protect a single room(no need flow check valve)
B. Muliti-hazard system (One system protect multiple rooms(use selection valve)_________
6 .do you need fire alarm products ( control panel ,detectors , gas lamp ) yes no
7. do you need pipe net and coupling
9>.do you need nozzle yes no
If nozzle requested please fill blew
Size: 1” 1.5” 2” 2.5”
Thread : Male female
Nozzle holes number-------PCS ,holes diameter ____mm
Before we make offer we need follow technical ,
we can send offer within 24 hours after received your information.
How the works and Construction, we have picture of schematic drawing
Since it is expensive gas , can"t make any in case accident not allowed happened .
means we have to tested 100% of parts before installation .
including the valve testing , mainifold pipe . cylinder would be nitrigen Gas test or ntirogen gas discharge test before HFC-227EA , even every small parts need be check any miss would cause inconvenient .
We packed by Fumigation-free Wooden case , no any trouble for your clear in customer
Give us the requested information , we can supply design free and also installation and test ....
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items