GF2-300KW silent three phase water cooled diesel generator
MODEL | GF2- 300KW | Standby Power (50HZ ) | 330KW / 412KVA | Prime Power(50HZ ) | 300KW / 375KVA | ENGINE DATA | Engine Type | NTAA855-G7A, 4-cycle | Air Intake System | Turbo,Air/Air Cooling | Fuel System | PT type fuel pump | Fuel Consumption (g/kw.h) | 206 | Cylinder Arrangement | 6 in line | Displacement | 14L | Bore×Stroke | 140×152(mm) | Compression Ratio | 14.0:1 | Rated RPM | 1500rpm | Max.Standby Power at Rated RPM | 377KW / 513HP | Governor Type | Electronic | Max Water Temperature | 104℃ | ALTERNATOR DATA | General Data | Compliance with GB755,BS5000,VDE0530,NEMAMG1-22,IED34-1,CSA22.2 and AS 1359 standards. | Alternator Data | Number of Phase | 3 | Connecting Type | 3 Phase and 4 Wires,"Y" type connecting | Number of Bearing | 1 | Power Factor | 0.8 Lag | Protection Grade | IP23 | Altitude | ≤1000m | Exciter Type | Brushless,self-exciting | Insulation Class,Temperature Rise | H/H | Telephone Influence Factor(TIF) | <50 | THF | <2% | Voltage Regulation,Steady State | ≤±1% | Alternator Capacity | 400KVA | Alternator Efficiencies | 93% | Air Cooling Flow | 0.8m3/s | Dimension & Weight | Open Type | Soundproof Type | Overall Size :2.9(m)×1(m)×1.75(m) | Overall Size :3.8(m)×1.35(m)×1.98(m) | Weight :2500kg | Weight:3100kg |
|
Contact us
How to come to Hi-earns?
♦ Line 1:TAXI
Shanghai International Airport(Pudong)
Cost(USD):85
Time:2.5 hours
♦Line 2:High speed rail
Shanghai Hongqiao railway station---Changzhou railway station
Cost(USD):20
Time:1 hour
Lisa Jia
Sales manager
♦ Mobile/WhatsApp/Wechat: +86-13328198882
♦ E-mail: hiearns5@ vip.163.com
♦ SKYPE: jia.lisa7
♦ TradeManager: cn220086459
♦ QQ: 1562536125
Customer Reviews total 0 items