North America 50.00%
Western Europe 20.00%
Eastern Europe 10.00%
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Features
It's used for various of button cell electric crimping .
Standard configuration can be used for disassembling CR20 series of coin cell. The machine has the advantages like small dimensions, easy operation, stable crimping , etc. Equipped with different moulds
can also be used for other works like powder pressing ,button cell disassembing etc .
1.Electric operation with touch screen .
2.High precision moudel design to ensure stabe sealing
3.Simple to change crimping die .
4.Small size can be put into glovebox through φ360 antechamber.
Technical Parameter
Power |
110 - 240V AC 50/60Hz for universal use |
Die Set & Compatibility |
Assembling dies for crimping CR2032, CR2025, & CR2016 coin cells (Optional CR2325, CR2450 die sets are available upon request). |
Pressure |
1. The pressure applied to seal the cell case is pre-set to a constant pressure at about 800 kg before shipping. the pressure applied to the negative cap of the cell to prevent case deformation. |
Structure |
Heavy Duty Steel Platform |
Protection Shield |
Protection shield / enclosure (plexiglass) with safety interlock is installed |
Product Dimensions |
250mm(L) x 150mm(W) x 450mm(H) |
Compliance |
CE |
Warranty |
Two years limited warranty with lifetime support |
Maintenance Notes & Warnings |
1. Electrolytes are highly corrosive materials.The die set must be cleaned with alcohol after each use to avoid corrosion crimping via spring loaded pressure. Do NOT over tighten the pressure adjustment knob to avoid damaging this PTFE die. until the spring compression is no longer stressed. Then start tightening the knob and stop turning it once the spring compression is felt. subjected to excessive pressure. |
Net Weight |
32 kg |
Shipping Weight |
46 kg |
Product Images
Related Machine for Coin Cell Preparation |
||
No. |
Products name |
Products link |
1 |
Tube Furnace/Muffle Furnace |
|
2 |
Planetary Ball Mill |
|
3 |
Vacuum Mixer |
|
4 |
Film Coater Machine |
|
5 |
Roll Press Machine |
|
6 |
Punching Machine |
|
7 |
Vacuum Drying Oven |
|
8 |
Glove Box Machine |
|
9 |
Sealing Machine |
|
10 |
Battery Tester Machine |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items