North America 50.00%
Western Europe 20.00%
Eastern Europe 10.00%
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Features
MSK-PN120 is a compact gas-driven Aluminum Laminated Films pouch cell forming machine for pouch cell fabrication.
*It adopts double start button, which is safe and reliable.
*Four guide pillars are adopted to ensure smooth up and down sliding and high precision;
*It is simple and quick to change the die and adjust the drawing depth;
*Sheet aluminum plastic film molding, suitable for R & D and sample preparation applications;
*Cylinder driven, no need of electricity, forming pressure and forming speed can be adjusted;
*Compared with similar products, the same quality of aluminum-plastic film is deeper and more stable;
*Precise mold design, no crow's feet and collapse angle are found at all corners and around the products after molding;
*The mould material imported from Japan and high strength chromium steel are adopted, and the surface is treated by environmental protection electroplating and baking paint;
*The appearance is exquisite, and the sheet metal adopts solid geometry design, which is simple and beautiful;
*It is easy to operate, safe and reliable with small volume;
Specifications
Features |
Pure pneumatic press with adjustable press speed and pressure. |
Forming Die Size |
Customized according to customer’s request, max. punching size: L65mm*W50mm |
Air Pressure Requirement
|
0.5MPa |
Max. Cup Depth to Punch |
< 6.0 mm |
Max. Punching Pressure |
1 metric tons |
AL Laminated Film |
Thickness of Aluminum Laminated Film: 0.10 - 0.20 mm acceptable |
Warranty |
Two Year limited warranty with lifetime support Rusting and damage due to improper storage condition or maintenance is not covered by warranty |
Product Dimensions |
L360mm*W230mm*H340mm; |
Net Weight |
45kg |
Detailed Images
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items