Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Product Details
240 LED Big deer head with plug.
2.4Meter with cool white led light.
Low voltage transformer.
IP 44 CE / RoHS
Item No. | |
Product Description | changeable Snowflake LED light including 216white led+90 blue led with plug+2.4M Wire low voltage transformer. |
Material: | Metal, Plastic |
Product Size: | Dia 60CM |
Package: | 1/6/0.1cbm |
MOQ: | 2pcs |
Payment term: | A) 30% deposit by T/T, 70% against copy of B/L |
B) Accept Paypal for small order | |
Color: | Can be customized |
Lead time: | 30 - 45 days, depend on order quantity |
Delivery Port | Xiamen / Ningbo / Shenzhen available |
Usage: | Home Decoration,Christmas Decoration, holiday gift, promotion items |
OEM & ODM | Welcome |
Mixed/Trial order | Welcome |
Click here for more details
<!doctype html>
hotsell07
Q1: Do you have a catalog or list?
We have thousands of products. And every year many new designs have been developed.
Please kindly advise which kind of product you are interested in. Then we recommend you
accordingly.
Q2: Can we have our own design? How about the sample charge and sample leading time?
OEM design will be welcomed, we can develop for you.
The sample fee will be charged based on the exact items, which will be refunded from future orders.
Q3: What's the payment term?
TT 30% Deposit, balance against faxed shipping doc.
For Long-term business, we can accept L/C at sight
Q4: What's the leading time?
Normally, it is 30-45 days if order been placed before every April.
Leading time will be around 60-90 days if order been placed between April-June.
Q5: Can we visit your Company?
Welcome to visit our company. It is About 30 minutes far from Xiamen Airport
We will arrange the car to pick you up after having the schedule.
Customer Reviews total 0 items