Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
China
Long Term
2019-10-17 02:48
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
LED Bulkhead Plastic Emergency 3 Hours Light
L122MN
Product Show:
Specification:
Maintained or Non-maintained | |
Input Voltage | 220V-240V 50/60Hz |
Charging Current | 120mA(Nominal) |
Lamp type | 5 pcs 5730 SMD LED |
Battery | Nickel-Cadmium Battery 3.6V 1.0 Ah |
Indicator | Green LED Indicates Charging |
Duration Time | More than 3 hours |
Construction | Fire-Retardant ABS Casing and Plate; PC Diffuser |
IP Rate | IP65 |
Installation | Wall Surface Mounted, Ceiling Surface Mounted |
Weight | 0.683kg |
Working Temperature | -10℃ to 60℃ |
Size | 345mm×107mm×76mm Tolerance ±0.03mm |
Customization | Battery, Duration Time, Package |
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shoping malls, office buildings,goverment buildings, teaching buildings, Domintaries and so on.
Parameters
Operation: Non-maintained
Input Voltage: 110V-127V 50/60HZ,220V-240V 50/60HZ;
Duration Time: >3Hrs;
Charging Current: 120mA(Nominal);
Lamp Type: 5pcs SMD LED ;
Operating Temperature: -10°C to 60°C;
Product Size: 345x107x76mm(LxWxH)
Tolerance:±0.03mm
Device Weight: 1KGS
Features
Long emergency time, more than 3h after sudden blackout
Intergress protection grade: IP65
Wide range application
shopping malls
office buildings
government buildings
teaching buildings
dormintories
Easy Installation
wall surface mounted
ceilding surface mounted
10 sets in Baster Carton
2. N.W.: 10KG
G.W.: 13KG
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1700m2, warehours occupies 1100m2
3. Main Products
1.Any Inquiries will be replied within 24 hours.
2. Professional manufacturer.
3. OEM/ODM available:
4. High quality, fashion designs, reasonable & competitive price, fast lead time.
5. After-sale service
Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.
6. Payment
You can pay for the order via: TT, Western Union, MoneyGram, L/C
1. What is the main differences of Fluorescent lamp and LED?
Main difference is power consumption and life span.
For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.
The life span of LED lamps 10 times that of fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time.
Other requirements from cutomers. Of course, the engineers will evaluate first.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items