Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
China
Long Term
2019-10-16 19:41
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Quantity(Square Meters) | 1 - 5000 | >5000 |
Est. Time(days) | 7 | To be negotiated |
PVC drift eliminator/Air Inlet Louvers modules improve air flow into the cooling tower, keep out debris, eliminate water splash-out (which can cause icing, near-site water damage, and costly water and water treatment chemical loss), restrict the amount of sunlight into the cooling tower (to impede algae growth), reduce noise from the tower, and improve the tower"s appearance.
Material Info : Air intake louvers are constructed of UV-stabilized PVC. This compound has outstanding resistance to weather exposure and is nearly impervious to chemical degradation by alkali, acids, greases, fats, oils, and biological attacks. It also has an excellent fire rating due to its self-extinguishing characteristics and meets or exceeds Cooling Technology Institute Standard 136. We also have PP and PVC material which can meet the water high temperature requirement.
• Significantly block sunlight (70:1 light reduction) to reduce algae growth on interior surfaces of the cooling tower system, thus reducing the cost of algae-removal chemicals and labor.
• Reduces noise leaving the tower through the louver modules by approximately three decibels.
• Achieves very low pressure drop results.
• Pre-assembled modules available in a variety of lengths.
• Optional Assembly frames made of extruded PVC available for easy installation and access for cleaning and maintenance (mounting flanges available on 1, 2, or all 4 sides).
• Rigid, UV-stabilized PVC meets Cooling Technology Institute Standard 136.
Packaging: be packed in carton or plastic film and pallet
Delivery Time:within 20 days since receiving the deposit
Transport:by sea, by air, by express delivery
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items