Devoted in led light product, shenzhen enjoy lighting co.,ltd located in shiyan,bao'an. We wish the led lighting can bring more green and more happy to all the people in the world, that is why we named itEnjoy led light.There are about 50 staffs include R&D department,QC department and manufacturing department. Our products have been certified by TUV,VDE,CE,RoHS,UL etc. All our products has been in a strict quality testing and aging before we ship to the clients. We do a lots of customize products and offer a perfect solution for many project.We are happy to a face to face talk and be long time partner with all the clients.
led grow lamp tube emergency led lamps rear lamps led led floor lamp modern led work lamp led fog lamp chandeliers led lamp
Description
New Arrival Led Retail Lighting solar led street light led ceiling light
Size
Customed
Brand
xlucky
Certification
CE, EMC, LVD, RoHS, TUV CB CE and RoHS LM79 LM80
Warranty(Year)
5
Packing
1.International export standard packing
2.Inside Bubble foam or paper as protecting
3.Outside 1pcs/carton flat packing
MOQ
10
Sample Time
7-10days
Bulk Production Time
25-35days
Port of loadign
Xiamen
Payment terms
T/T, 30% deposit in advance, 70% balance against of the B/L copy
Other
Custom
FAQ
1. Q: How To Order ?
A: Step 1, please tell us what model and quantity you need;
Step 2, then we will make a PI for you to confirm the order details;
Step 3, when we confirmed everything, can arrange the payment;
Step 4, finally we deliver the goods within the stipulated time.
2. Q: When will make delivery ?
A: Delivery Time
-Sample Order: 7-10 days after receipt of the full payment.
-Stock Order: 15-20 days after receipt of the full payment.
-OEM Order: 30-45 days after receipt of the deposit.
3. Transportation.
Transported by DHL, UPS, EMS, Fedex,Air freight. sea freight.
4. Payment.
T/T,L/C,Escrow.
5. Can I custom the color ?
-Yes, we will produce any color you want.
6. Are you a manufactory or trading company? A: We are a manufactory.Our manufactory has been Specialized in manufacturing various led lamp
7. Where is your manufactory? Can I visit ? A: Our manufactory is located in Xiamen Fujian. You are warmly welcome to visit whenever you are available.
8. What about delivery time of the mass production? A:After we received the deposit,normally 15 to 20 days we can ship.it also depends on the order quantity and led lamp design
9. Could you design and produce according to customers'requirements
A: Sure, we have very rich experience in customizing led lamp .
10. What makes you different with others? A:(1)Professional designer and skillful engineering team.
(2) Factory direct deal,Firm structure& guaranteed quality.
Customer Reviews total 0 items