OT-ES805S led self test LED Exit sign

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Emergency Lighting
  • Validity Period:

    Long Term

  • Published on:

    2019-10-16 17:49

  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
Orientec
Bulb Type:
LED
Battery Type:
Ni-Cd
Material:
Plastic, ABS Body+ PMMA Diffuser
Usage:
exit sign, public room for evacuation indicator
Certification:
CE
Specifications:
8*0.06W
Color:
White black or others
Battery type:
Ni-CD 3.6V 800mAh
ECO- Friendly:
ECO-self test LED Exit sign
Chips:
8*0.06Wgreen LED Bulb
emergency time:
>3 hours
Supply Ability
Supply Ability:
20000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
each self test LED Exit sign in a inner box, and then in outter shipping carton
Port
NingboShanghai
Video Description
Relate Non-maintaine

Click the series number for more details

    
Non-maintained seriesMaintained seriesCombined  seriesExit-Sign

 

 

 

 

 

 

 

Details of self test LED Exit sign

 

Product Description
Machinary data
Item:OT-ES805S self test LED Exit sign
Size: See Left
Material: Fire resist ABS +PMMA
Weight:565g 
Anbinate temperature: 0~55°C
Guarantee: 4 Years
IP/IK: IP20 / IK08

 

 

Electric DataRate Supply voltage174~264V 50/60HZ
Main Power2W
Typical λ(@230V 50HZ)>0.8
Leak Current (PE)0
Over Voltage protection320V(1H)
Max Permit forward voltage LED3.7

  

Electric Date

Emergency

Battery pack type3 pcs NI-CD pack  3.6V 0.6Ah
Emergency moldmaintained
Max forwawrd Emergency LED3.7V
Charing current35mA / 24 hrs
Discharging15mA / 3hrs
Changeover<0.1S  @150V AC
Battery protectionMax:4.2V / Min2.7V
Test Button / rest mold / inhibit moldN / N / N
Emergency standard(full compliant)

IEC60598-2-22:2014  BS5266:2016

IEC62034:2012

  

Optical Data

 

efficacious LED chipLED F546 bulb 8 pcs 
Lumen80LM Max

 

Self-test 

(New updating in 2019)

 

How Self test works 

  • On installation, the internal clock will assign a date for the monthly and annual test – the installer does not need to set anything up!
  • The initial monthly test will occur after charged 48 hours after installation. Subsequent monthly tests will occur every 30 days.
  • The initial full test will occur between 200 and 360 days from installation. Subsequent annual tests will occur every 360 days.

 

    

Self test behavor

  

 

Install mode 1: hunging  mode

 

Install mode 2: Side mounting install

 

 

Install mode 3Ceiling install

 

 

 

The diagram on the exit sign.  Based on ISO7010

 

 

  

 

 

Packaging & Shipping

PACKING INFORMATION of this self test LED Exit sign

 

Packing: color box with polyfoam
Inner packing: 1pcs/inner box
Outer packing:20 pcS/CTN
Carton Size:46*41*47.5cm
cG.W.: 12KGS
N.W.:10GS

 

 

Our Services

1. Projects & Technology Creating

2. Professional Technology support of self test LED Exit sign

3. OEM & Stratage service

Company Information

General instruction of OTC Electronic:

1. Ningbo OTC Electronic Co. is Branch of OTC IND.  This branch just specialize LED lighting.  It contains:

    A.  Low voltage version,  EMC and RoHS compliant.  For supermarket.

    B.  220V/110V industerial lighting.  EMC/ LVD/ RoHS compliant.  We work with famous 

    C.  Emergency light for project only.  IEC60598-2-22:2014 full compliant. This used for bid government project.

    D.  OTC Own the patent of some item in this website. 

 

2. Orientec Elec. with separate R & D depart.  We apprecite you ideas about impove our current items.

     A.  The engin team in OTC proficent  ProE, UG, Auto CAD and Protel. 

     B.   The Marketing team will show you the trend in LED field.

     C.   You can sent inquiry as followed chart.

  

FAQ

 1. Q: What is the quality standard? 

   ALL rhe emergency light in From OTC is full IEC compliant. Please don"t try to persuade OTC use Li-ion battery as battery system.   

   PS:  The engineer can remove your doubt based on IEC/ CE documents  clause by clause.

 

2. Q:  Does the R&D depart show solutons free of charge?

   

  A:  If just some doubt. Solutions are not needed. Free of charge.

           eg.  Why the sensor of my light run out so quickly,  How yours can confirm 4 years guarantee?

                   Why the battery of our emergency light die just 50 cycles.

 

   B:  If you need new solutions.

 

          Part 1;  Draft solution sheet is free.

                  a.   The construction solution sheet just with some Auto CAD 2D drawing.

                  b.   The PCB solution just with general description.

 

          Part 2;  Formal solution sheet cost need confirm with sales manager.

                  a.   The construction solution sheet together with 3D drawigns.

                  b.   The PCB in protel and show you the sample to prove the function

 

   C:  If solution confirmed.  and order placed. The solution cost will be refund.

 

 

3. Q: MOQ, main market    

  A:  The MOQ is 200pcs

  B,  The main market of OTC is Western Europe(especially UK and DE) and  US, AR, and AU.

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links