Production Line Lithium Battery Top and Side Hot Sealer for Pouch Cell Initial Sealing

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Batteries
  • Validity Period:

    Long Term

  • Published on:

    2021-12-28 12:22

  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Product Description

  

Production Line Lithium Battery Top and Side Hot Sealer for Pouch Cell Initial Sealing

 

Features

1.Suitable for soft packing lithium core top-side heating sealing 

2.The 4 stations turntable structure, cam positioning, precision bias error is less than ± 30

3.To configure a single head pressure regulator

4.Import PLC, touch screen control display, imported thermostat, error of ± 2 °C

5.Fixture locating detection, double-side heating, temperature alarm, screen protection

6.Using the programmable controller PLC practical automatic control, touch screen to realize man-machine dialogue, convenient operation

 

 

Technical Parameters 

 

Main technical 

parameters

TTS001

       TTS002

TTS003

Size(L*W*H)

870*870*1500mm

970*970*1500mm

1100*1100*1500mm

Weight

500kg

800kg

1000kg

Max sealing size

top:200mm side:200mm

top:240mm side:240mm

top:240mm side:240mm

Sealing head length

210mm

250mm

330mm

Sealing stamp width

2-10mm

2-10mm

2-10mm

Production capacity

200-600pcs/H

100-250pcs/H

100-200pcs/H

Temperature error

 ± 2 °C

 ± 2 °C

 ± 2 °C

Source voltage

AC 220V

AC 220V

AC 220V

power

3.5KW

3.5KW

3.5KW

Air supply

0.6-0.7Mpa 10L/S

0.6-0.7Mpa 10L/S

0.6-0.7Mpa 10L/S

 

product Images
Our Company & Team

Certifications

CERTIFICATE

Strength Proof

All our products are passed the inspection standards included SGS, CE, ASTM with 100% quality.

Cooperative Partner

Packaging & Shipping

PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

FAQ
About Product

 1.Which procedure to secure your Quality?

Our company has own research & development and production base, the products have been calibrate by central laboratory professionals before before they leaves the factory, ensure the accuracy of test results and authority.
2.How about your company product after-sales service system?
Product after-sale guarantee period is 12 months,and we can provide lifetime repair guarantee.We have agents in some countries,they can provide door-to-door service.If there is no agent,our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.
3.Products standards?
Our instruments adopts ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.
4.Our country's power supply and plug are different, how do you solve it?
We can according to different countries and the power plug, equipped with transformer and plug that in accordance with your local requirement.
5.Payment methods?
T/T, L/C, D/P and so on
6.Packing method?
Standard export wooden box packaging
7.How about customers evaluation for your products?
Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek,our high quality products and first-class after-sales service.Our services get the trust of the customer satisfaction and recognition for themselves.
8.Main export market?
Now our products have been exported to North America, Europe, southeast Asia, South America and other countries.
10.How to ensure the customer standard use the instrument?
We can provide each product related video showing how to install and operate.If you have specific needs, we also can arrange engineer to the customer's company for equipment operation training.
 
About Shipping

 1.Order processing?

Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damage part for you for free.
3.Order tracking?
Online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.
If you need a tracking number for your order, please send an email to us with your order/invoice number.
4. Import/export tax, duty, GSM, Customs Clearance, and etc?
All import/export related expenses are sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.
5.Lost or Stolen packages?
Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.

 

Contact Us

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links