sectional fire galvanized steel flexible insulated water storage tank

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Lights & Lighting
  • Validity Period:

    Long Term

  • Published on:

    2019-10-16 19:42

Other Products
fire water storage tanks water storage tank 50000 liter assemble water tank
¥Negotiable 11Views

fire water storage tanks wat

Recommend  
200 meters fiberglass snake rodders frp duct rods 4 core cables with fiber rod
¥Negotiable 10Views

200 meters fiberglass snake

Recommend  
telescopic pole cable puller fiberglass cable push rods wire tracing tools
¥Negotiable 9Views

telescopic pole cable puller

Recommend  
12mm 150m fiberglass rod cable duct rods glassfiber wire fish cable fiber optic pullers
¥Negotiable 12Views

12mm 150m fiberglass rod cab

Recommend  
fiberglass reinforced plastic tank environmental grp sectional water tank frp assemble water tank
¥Negotiable 8Views

fiberglass reinforced plasti

Recommend  
You may like
  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Overview
Quick Details
Place of Origin:
Hebei, China
Brand Name:
lanyu
Material:
wooden, Galvanized steel
After-sales Service Provided:
Online support
Warranty:
More than 5 Years
Product name:
sectional fire galvanized steel flexible insulated water storage tank
Color:
Silver
panel size:
1*1m, 0.5*0.5m
Usage:
Storage water
Tank capacity:
1m3~5000 m3
Tank size:
according to the volume and customers request
Using life:
≥20 years
Other name:
Grp Water Tank
Shape:
Rectangular and square
Supply Ability
Supply Ability:
3000 Set/Sets per Month
Packaging & Delivery
Packaging Details
galvanized water tank be packed in bulk or pallet
Port
tianijin

sectional fire galvanized steel flexible insulated water storage tank

 

Galvanized Steel Combined  Water Tank is punched by Q235A into 1220mm*1220mm or 1000mm*1000mm and 1000mm*500mm, 500mm*500mm standard panels, drilling around, after HDG treatment, assembly at site. When combined, the gap between two standard panels is sealed by silicon pad, connected by bolts.

If there is any need about Galvanized steel panels assembled water tank,please contact me freely.

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links