Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Type: |
Array |
China
Long Term
2019-10-16 22:51
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Type: |
Array |
Quantity(Pieces) | 1 - 100 | >100 |
Est. Time(days) | 7 | To be negotiated |
LED Emergency Light | |
Power | 20W |
Lumen | 1600LM |
Input Voltage | AC85-265V 50/60Hz |
Color Temperature | 3000K/4000K/6000K |
Housing Color | Black/White/Grey |
Charging Time | 12 -16 Hours |
Emergency Time | 3 hours /1 hours/2hours |
Product Size | 300*300*85mm |
Die-casting Aluminum lamp body,excellent heat dissipation
Plastic cover, high impact resistance, IK10 approval
304 Stainless steel hexagon socket head cap screws
Silicone waterproof gasket to prevent water into the lamp
We use Taiwan high lumens Epistar Chip
Lumen:80LM/W CRI> 83
High quality driver, CE RoHS approval
Power factor> 0.93, no flicker, IP66
Mean-Well or Non-mean well driver is available for customer choose base on order request
UGR < 19
SDCM value of the led that we use (Mac AdamEllips - binning) <3 or 5
Temperature test is 47-49 degree
Cable (GLOW WIRE): VDE, IEC approval
Built-in Motion Sensor available
Detection area can be adjust from 2m to 10m
Hold time 5s, 30s,90s,3mins,20mins,30min base on request
Daylight sensor detected regardless of ambient light level.
50lux, 25lux, 10lux, 2lux: darkness operation only.
with main power 220-240V, we offer 15W and 20W
When power cut off, with emergency power 8W , runningtime: 3-4 hours.
Charge time: 12-16 Hours, when indicator of charger on red is charging,off means full charged.
Model No. | HF-CL20R300 | Operating Time | 3 hours |
Prodcut class | emergency/battery light | Charging Time | 12 hours |
Life time | 50,000 hours | Battery Capacity | 4400mAH, 7.2V |
Power Factor | >0.92 | Warranty | 2 years |
Payment T/T , L/C , Paypal , Western Union
Small order is 100%, for large amount,30% down payment, 70% balance before shipping
Delivery time: Sample in 3- 5 working days, large order 7-15 working days
By express DHL,UPS,FedEx,TNE, by Airfreight,by Sea
We got the license of ISO9001:2008, all products has pass CE, RoHS, SAA approval etc.
We facilitates a production capacity
of above 8,000pcs LED High Bay,
20,000 LED emergency Light /month,
50,000 meters/day led strip
Hofo own the professional advanced production and testing machines, standard testing laboratory for testing driver,led lamp,led chip before shipping
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
A:Sample needs 3-5 days, mass production time needs 7-15 days
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional..
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements and make PI
Thirdly customer confirms the details and arrange payemnt for order.
Fourthly We arrange the production and then inform customer to delivery goods.
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
A: Yes, we offer 2-5 years warranty to our products.
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less
than 0.2%.
Secondly, customers need to offer pictures or video to confirm the problems first
Thirdly,during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution i
ncluding re-call according to real situation.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items