Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Type: |
Array |
China
Long Term
2019-10-16 16:28
Scan By Phone
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Type: |
Array |
High Bay LED Light Aluminum Housing Cattle Farm Illumination
1. Four innovative design: copper pipe riveting technology, advanced modular heat sink, air convection design, air path optimization.
2. CREE X-PE chip of 100-110Lm/w, MW IP65 driver of HLG series, to ensure the most stable quality.
3. Three different reflector angle, 60°,90°,110° are available.
4. The whole system is anodized and even the PC diffuser is flame resistance and strong antioxidant, which decide it is no problem to stand extreme temperature: -25℃-50℃.
Size Drawing
PC Shell & External Driver Version are available
Input Volt. | 100-240VAC |
Frequency Range | 50/60Hz |
Power Factor | >0.9 |
THD | <15% |
Color Temp. | 3000K-6500K |
Color Rendering Index | >80 |
Working Temp. | -20~50℃ |
StorageTemp. | -40~85℃ |
Working Humidity | 10-95%RH |
Material | Aluminum+PC |
Emitting Angle | 45°/60°/90°/120° |
Protection Rate | IP44 |
Lifespan | >50,000H |
Model | Power | LED Chip | Driver |
GK-060 | 60W | 120PCS Epistar SDM3020 | MW HLG-60H-36A1PC |
GK-080 | 80W | 160PCS Epistar SDM3020 | MW HLG-80H-36A1PC |
GK-100 | 100W | 200PCS Epistar SDM3020 | MW HLG-100H-36A1PC |
GK-150 | 150W | 75PCS CREE X-PE | MW HLG-150H-36A1PC |
GK-200 | 200W | 100PCS CREE X-PE | MW HLG-240H-36A1PC |
GK-300 | 300W | 160PCS CREE X-PE | MW HLG-150H-42A2PCS |
Applications for high bay led light:
Widely used for high bay lighting factories, workshops, warehouses, logistics centers,exhibition halls, stadiums, shipyards, mines, highway toll stations, gas stations, supermarkets, farmers markets, etc, to replace 250w HPS lamps.
Crown Extra, a manufacture provides lighting solutions for industrial space, both in hazardous and non-hazardous location since 2011.
Why choose us?
1 Professional manufacture in industrial lighting since 2011.
2 OEM & ODM is welcome, more than 100pcs can help put your logo without extra charge.
3 Sample is available, you can get sample on hands in 5-8 days after payment.
4 Fast service and on-time delivery
5 Factory price
Welcome your inspection of our factory
About 1 hrs from Shanghai to our factory
Q1. What are your terms of packing?
A: Generally, we pack our goods in corrugated carton or wooden box, suitable for shipping container.
Q2. What is your terms of payment?
A: L/C, 100% T/T in advance or T/T 30% as deposit, and 70% before delivery.
Q3. What are your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q8: How do you make our business long-term and good relationship?
A1: We keep excellent quality, thoughtful after-sales service and competitive price to ensure our customers" benefit;
A2: We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items