Counter Flow Cooling Tower PVC fill And Drift Eliminator
After-sales Service Provided:
Overseas third-party support available
Warranty:
3 Year
Supply Ability
Supply Ability:
50000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
packing is as your demond
Port
tianjin port
Lead Time:
15 days after the shipment
Product Description
Counter Flow Cooling Tower PVC fill And Drift Eliminator
PVC drift eliminator modules improve air flow into the cooling tower, keep out debris, eliminate water splash-out (which can cause icing, near-site water damage, and costly water and water treatment chemical loss), restrict the amount of sunlight into the cooling tower (to impede algae growth), reduce noise from the tower, and improve the tower"s appearance.
Specifications
Sheet Width
Sheet Length
Thickness
Sheet Spacing
65mm
Customized
Any Length
0.2-0.4mm
25-31mm
130mm
145mm
Detailed Images
The workshop
Packaging & Shipping
Related products
FAQ
Q: Are you trading company or manufacturer ? A: We are manufacturer with our own factory.
Q: How long is your delivery time? A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ? A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer"s side.
Q: What is your terms of payment ? A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.
Customer Reviews total 0 items