Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Product Details
Description of T5/T6 LED tube with G5 pin replace T5 fluorescent led tube for usa market with DLC
LED T6 Tube is the upgraded replacement product of T5 Tube,it is biger diameter than LED T5 to put more led insie with high Luminous.
Item Details:
T6 with G5 pin 1149mm 15W 1800LM:
Manufacture: ARK | Power: 12W | |
Item No.: ARK/BA/12K12(xx140) | Input Voltage: AC100-277 V(50-60Hz) | |
Materials: Aluminum+PC | Light source: LED SMD2835 | |
Connector Type: G5 | LM: Milky:1700lm±5%, Clear:1800lm±5% | |
CCT: 3000k/3500k/4000k/4500k/5000k | CRI: CRI(Ra)Ra>83 | |
Beam Angle: 120° | PF: >0.9 | |
Size: 1149 mm | Certificates:DLC | |
Weight: 0.45kg | Temperature: -20 to 40℃ | |
IP Rate: IP44 | Lifespan: 50,000hrs |
Application :
- School/universities/hospital
- Conference/meeting room, show room
- Commercial complex
- Factories/offices
- Supermarkets
- Residential/institution buildings
1. By Express: such as DHL, UPS, TNT, FEDEX etc. The dispatch time is about 3-5 days.
2. Air Freight: when your order more than 100kgs which will be more economical than express.
3. Sea Freight: we will update sea freight once we know your sea port where goods will be delivered.
4. Agent designated by client: please tell us the contact detail of your shipping agent and we will arrange
to deliver the items.
1. Provide solutions and high quality products with reasonable price
2. Streamline the buying and paying processes
3. Deliver the goods to our customers all over the world with speed and precision
4. Protection of your sale area, ideas of design and all your private information
5. Warranty: 5 years
ARK established in 2007, focus on developing,manufacturing and marking high quality
LED lighting products. With excellent R&D team and over three years’ experience in the filed
of LED source----high power LEDs,we have the leading technology on achieving highest
luminous efficiency LED lighting products.Main product is LED tube which is VDE, TUV, ERP,
CE,ROHS,DLC, lighting facts, FCC, PSE approve for different market.Under the current
sales circumstance, ARK lighting is exploiting the new path which is featured as advanced
technology and outstanding R&D team, stable function and excellent product. What is more,
ARK is always reducing cost through technological innovation,increasing cost performance
and providing sincere service to customers.
2018 ARK Lighting Lighting Fair information:
"HK Lighting Fair"(Spring Edition 2018);6-9th APRIL ,2018,Booth No.:1C-E33
"LFI 2018 TRADE SHOW" : 8-10th May ,booth No:2479
we got UL DLC ,VDE, TUV, ERP, CE,ROHS,DLC, lighting facts, FCC, PSE approve for different market.
Is the led tube heat disspation good?
yes
1,we use the high quality Epistar smd2835 leds,good quality and high power efficiency,
that the heat are reduce more!
2,The PCB bored,we use the aluminum meterial ,it easy for heat disspation!
3,Big aluminun outside for the heat disspation.
Is the led tube safety when shipping?
Yes
1,we use the strong bubblepak safe packing for evey tube!
2,For 25 CTNs ,we put them in a pallet to protect it!
Why chose us?
1, we have 8 years experience in US market for the led tube!
2, All of our led tube for US market with certificate UL,DLC
How many years warranty do you have for LED tubes ?In case something goes wrong and we need to use warranty, what is procedure for getting new lamps?
1,we offer 5 years warranty for led tube
2,We have our warranty letter, in warranty period, in case of any our product is found to be defective
in materials or workmanship,we will send replacement or rearing the defect and return back to you!
Customer Reviews total 0 items