Thermoplastic ABS exit sign LED emergency exit lights emergency lamp

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Emergency Lighting
  • Validity Period:

    Long Term

  • Published on:

    2019-10-16 21:50

  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
OEM
Model Number:
MJ-3(G)
Bulb Type:
LED
Battery Type:
Ni-Cd
Material:
Plastic, thermoplastic ABS housing UL 94V-0 flame rating
Usage:
escape
Certification:
UL
Specifications:
2W
Rough Weight:
8.5kg
Battery:
700MAH NI-CD BATTERY
Backtime:
≥90MINS
Light Source:
GREEN LED
Operating Temperation:
0-40°C
Color:
Green
Product Name:
Exit sign
Supply Ability
Supply Ability:
50000 Piece/Pieces per Month Exit sign
Packaging & Delivery
Packaging Details
Carton size:37.8*34*22.5cm
Port
Ningbo or Shanghai
Lead Time:
30 Days after paid
Product Description

ITEM NO.MJ-3(G)
Specification2W
Materialthermoplastic ABS housing UL 94V-0 flame rating
Output Interface120/277VAC 60HZ
Battery4.8V 700MAH NI-CD BATTERY
Operating temperation0-40°C
Light SourceGREEN LED
Backtime≥90MINS
Rough Weight8.5kg

 

 

 

 

 

 

 

Other Products

 

Packing & Shipping

 Packaging Details:carton size 37.8*34*22.5cm ;

Shipping Way: by air,by sea or by express ;

Delivery Time: about 10-30 days after paid. 

Company Information

 

FAQ

1.What is your shipping way?

   Depending on you, you can choose by air or sea,You can also choose express.

2.Are you a factory or trading company?

   Yes. We have production line and manufacture over 10 years.

3.Where is your factory located?

   Our factory is located in Xiaoyue Town,Shangyu District,Shaoxing city,Zhejiang Province,China.Near to Ningbo port, the second largest port in China, 

convenient transportation and low cost, and close to Shanghai, convenient for customers to visit our factory.

4.How does your factory do regarding quality control?

   All the selling products will be tested in 100% to make sure qualified quality and long lasting,and all the operations conducted according to ISO9001.

5.What is your delivery time?

   It will take about 10-30 days to finish an order. But the exact time is according to actual situation and your order quantity.

 

Contact Us

 

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links