Western Europe 30.00%
Mid East 25.00%
North America 12.00%
Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
1. Mould tooling lead time: T1 sample, about 3-10 weeks, according to the mold requirement.
2. Production lead time: 2-5 weeks, according to the order Qty.
3. Packing: 1set/wooden Carton for Mould and export carton for switches and sockets
4. Port of loading: Shanghai, China
Wintop has passed ISO9001, ISO14001 certifications, has professional and technical staff, advanced manufacturing equipment, perfect testing skill and large production capacity.
Wintop has 25 fully automatic plastic injection molding production lines. We have received many compliments from our customers in Europe, the Middle East, North America and Domestic
Wintop has 8 Manual assembling production lines and Automactic Assembling machinery for both Switches and Sockets.
Our Workshop
Our Warehouse
Our Team
Packing Details : 1set/wooden carton
Delivery Details : 15-50 working days after deposite
Worldwide Customers choose Wintop for its rich experienced engineering team, sufficient injection and stamping moulding machines, automatic assembly equipments, skilled workers and capable sales team with reasonable price.
A: You can provide us a sample, we will design the 3D drawing accordingly.
A: Yes, we could offer the samples for free charge but do not pay the cost of freight.
A: Customer.
A: For moulds/tools, we will coat one-layer anti-rust oil and cover films on the mould/tool, then pack into fumigation wooden case.
For product pricing, customiztion, or other inquiries
Contact Supplier
Customer Reviews total 0 items