Homepage|Business Center|Save the Page|Get the App
普通会员

Linyi Tongxin Electric Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > 7025 70mm mini USB electric fan, 3 inch battery operated exhaust fan DC mini fan, 70X70X25mm ball or sleeve bearing axial fan
7025 70mm mini USB electric fan, 3 inch battery operated exhaust fan DC mini fan, 70X70X25mm ball or sleeve bearing axial fan
Click on the image to view the original image
Product: views:67025 70mm mini USB electric fan, 3 inch battery operated exhaust fan DC mini fan, 70X70X25mm ball or sleeve bearing axial fan 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-23 21:01
  Negotiated
Product Details
Our Services

1.  Warranty: 1 year warranty for all products.

2. Products Quality: 100% products inspection before delivery.

3. Just in time delivery: Normally, Lead time is in 30 days.

4. Customized Service: As we have our own molding department,

    customized service can be provided.

5. Prompt customers Services: E-mail will be replied in 24 hours.

 

Company Information

        Located in Hedong district, Linyi Tongxin Electrical Co,.Ltd, with an 8000-square-meter building area, is engaging in a whole series of research and development,manufacturing,sales and service of ac fan and dc brushless fan.

 

 

FAQ

 

1.  What is a DC Axial Fan?

An DC fan is usually powered by 3v, 5v, 12v, 24v, 36v and 48v. It blows air along the axis of the fan, or parallel to the track of the blade axis. 

 Standard DC Axial fan sizes include 20mm, 30mm, 40mm, 50mm, 60mm, 70mm, 80mm, 92mm,120mm, 150mm,  and 200mm.

 

2. How to choose a DC fan?

To choose a DC fan, you should consider the points below

*fan voltage

*fan current

*fan speed

*fan airflow

*fan noise

*fan lifespan

 

3. What is a Bearing?

Fan bearing includes Sleeve Bearing and Ball Bearing, life expectancy of sleeve bearing fan is 30000hours, while ball bearing is 55000hours or more.

 

4. How do we carry out quality control?

Usually, there are two ways to monitor reliability during the manufacturing process.

* Early Life Test

This is used as a mean of process control aimed at identifying any latent manufacturing problems and determining the effectiveness of burn-in. Every day, 5 samples will be picked up randomly from one of the production lines for burn in at 50°C+/-5°C for 24 hours.

*On-going Reliability Demonstration

This is a longer-term program aimed at providing data on continuous basis to demonstrate the reliability of product. 10 units per month are randomly collected from one of the production lines for burn-in for 168 hours at 50°C+/-5°C. Units are monitored and tested on daily basis. Failed units will be analyzed and corrective actions taken where necessary.

 

5.What is the divery time 

Sample lead time:3-5 days

Mass production Delivery lead time: 1 -3 weeks(Depend on the quantity)

Delivery Ways: DHL ,UPS Door to Door service ,By Air ,By Sea ,etc.

询价单
total0items  Comments